Site-96 Incident Summary
Site-96 Incident Summary
Blog Article
This documentation details the current anomalous activity detected at Site-96 on date. At approximately time, multiple staff reported experiencing bizarre sensory phenomena. Preliminary investigations suggest the anomaly is centered around a specific area. A team of containment specialists has been dispatched to Site-96 and measures are being taken. Further reports will be provided as they become available.
Secure Containment Protocols: Site-96 Update
Recent events at Site-96 have necessitated a review and revision of existing containment protocols. The primary concern stems from the anomalous activity exhibited by SCP-number. This alteration in behavior presents a potential threat to both personnel and the surrounding environment. To mitigate this risk, several implementations have been enacted. A new containment cell, constructed with upgraded materials, has been deployed for SCP-number. Additionally, personnel rotations will be adjusted to minimize exposure and potential infection. All personnel are reminded to adhere strictly to the revised protocols outlined in document designation.
- Specific protocol changes remain classified pending further analysis.
Investigation Log: Site 96 - Personnel Restricted
Subject Alphabetical designations remain heavily Redacted. Initial Assignment records for Agent Smith, designated as Task Force Bravo lead, are Incomplete. Evidence suggests a potential Compromise during the initial Interaction with SCP-96. Further analysis of recovered data is required to determine the full extent of the Situation.
- Supplemental log entries are currently Unavailable for declassification review.
- Site security protocols Were/Are/Have Been implemented following the incident, including but not limited to, increased perimeter Monitoring, access restrictions, and mandatory Briefings.
The primary objective remains containment of SCP-96 and mitigation of any Consequential effects.
Log Entry: Site-96 Breach Protocol Activated
At precisely hour:minute hours on date, a containment breach was registered at Site-96. The breach involved an anomalous entity of unknown origin and potential hazard rating. All personnel have been alerted to execute the established breach protocol, designated as "Red Level". Current reports indicate heavy resistance from SCP-number and significant infrastructure damage. A full assessment is underway to determine the extent of the breach and the status of all personnel. Further updates will be communicated as they become available.
Designated Termination Procedures
This document outlines the guidelines for authorizing termination actions within Site-96. Access to this information is strictly limited to designated personnel as listed below. Any unauthorized access or dissemination of this Site Ninety Six document will result in severe penalties.
- Authorized Staff:
- Director of Site-96
- Site Overseer
- External Authorizations
All terminations must be justified in writing and adhere to the strict protocols outlined in Addendum A: Termination Protocols|Appendix B: Security Clearance Levels}. Failure to comply with these regulations may result in legal ramifications.
Request Denied
Following detailed review of the submitted request for release pertaining to Site-96, the Deciding Committee has issued a formal denial. The causes behind this decision are classified and will not be shared at this time. Additionally, any subsequent requests regarding Site-96 will be subject to the same rigorous scrutiny and may result in identical outcomes.
- Please refrain from seeking any unauthorized access to information concerning Site-96.
- All breaches of this directive will be met with administrative action.